Authors:

Richard Antony Suatan, Ida Ayu Dwi Giriantari, I Wayan Sukerayasa

Abstract:

“The micro hydro power plant (PLTMH) in Banjar Dinas Mekar Sari, was built independently by community groups in 1980. With the use of traditional technology, the efficiency of PLTMH is low, so it is necessary to re-plan for PLTMH Banjar Dinas Mekar Sari to operate more optimally.. One of the most important factors in planning is financial / economic factors. This factor will be used to assess a plan whether it is feasible to build or not. The parameters used in determining economic factors are Net Present Value (NPV, Internal Rate of Return (IRR), Benefit to Cost Ratio (BCR), Life Cycle Cost (LCC), and Break Even Point (BEP). Economic feasibility analysis has been carried out. for planning PLTMH Banjar Dinas Mekar Sari obtained, BCR of 0.23 and -0.08 and NPV value of Rp.476,747,506 and -Rp.161,451,546 are positive when the discount rate is 10% and negative when the discount value is 12%, and the amount of the IRR value 1% and 0% do not exceed Indonesia’s Expected Annual Rate of Return, which is 14.6%, and the amount of BEP units that must be sold to reach a cash flow point is Rp. 0 of 2,294,914.96 kWh, and the amount of payback period at This project is 2 years 2 months. So seen from the existing economic parameters, the design of PLTMH in Banjar Dinas Mekar Sari is not feasible from an economic point of view because the large profits obtained from the design of PLTMH Banjar Dinas Bembang Sari do not exceed the initial start. al cost (investment cost).”

Keywords

Keyword Not Available

Downloads:

Download data is not yet available.

References

  • [1] Keputusan Menteri Energi dan Sumber Daya Mineral No. 39
  • K/20/MEM/2019. Tentang Pengesahan Rencana Usaha Penyediaan
  • Tenaga Listrik PT Perusahaan Listrik Negara (Persero) Tahun 2019
  • Sampai Dengan Tahun 2028.
  • [2] Kementrian Energi Dan Sumber Daya Mineral. 2016. Jurnal Energi
  • Media Komunikasi Kementerian Energi dan Sumber Daya Mineral.
  • [3] Balitbang ESDM. 2017. Ketenagalistrikan dan EBTIKE, Mikrohido.
  • Jakarta : Kementrian ESDM
  • [4] Dutch-German Partnership Energising Development Mini Hydro
  • Power Project. Panduan Singkat Pengembangan Pembangkit Listrik
  • Tenaga Mikrohidro (PLTMH). Jakarta : Kementrian ESDM
  • [5] Coaction. 2019. https://coaction.id/air-sebagai-sumber-energiterbarukan/.
  • Jakarta : Collaborate Advocate Breaking Barriers.
  • [6] Balai Wilayah Sungai Bali-Penida. Data Tukad Banyumala, Tukad
  • Pasut. Bali : Kementrian PUPR.
  • [7] Widiana, Nengah. 2020. Perancangan Penstok (Pipa Peesat) Untuk
  • Pembangkit Listrik Tenaga Mikrohidro (PLTMH) Di Banjar Dinas
  • Mekarsari, Desa Panji, Kecamatan Sukasada, Kabupaten Buleleng.
  • Bali : Universitas Udayana
  • [8] IMIDAP. 2009. PEDOMAN STUDI KELAYAKAN EKONOMI /
  • FINANSIAL. Jakarta : Kementrian ESDM.
  • [9] Barringer & Weber. 1996. Life Cycle Cost Tutorial. Fifth International
  • Conference on Process Plant Reliability.
  • [10] Ulfathu, Vivin. 2016. Analisis Break Even Point Sebagai Alat
  • Perencanaan Penjualan Pada Tingkat Laba Yang Diharapkan (Studi
  • Kasus pada Perhutani Plywood Industri Kediri Tahun 2013-2014).
  • Jurnal Administrasi Bisnis (JAB), Vol. 35 No. 1 hal. 196-206.
  • [11] Focus, Guru. 2020. Buffett Indicator: Indonesia Stock Market
  • Valuations and Expected Future Returns.
  • [12] Abdul Choliq. (2004:59). “Pengertian payback period” diakses dari
  • https://rumus.co.id/rumus-paybackperiod/#
  • Cara_Menghitung_Payback_Period
  • [13] Laksana, Ari. 2020. Redesain Turbin 175 kW Untuk Pembangkit
  • Listrik Tenaga Mikrrohidro PLTMH Desa Mekar Sari Buleleng Bali.
  • Bali : Univesrsitas Udayana
  • [14] Aprilyanto, Eka. 2020. Perencanaan Sistem Kelistrikan Pembangkit
  • Listrik Tenaga Mikrohidro Di Banjar Dinas Mekar Sari, Desa Panji
  • Kecamatan Sukasada, Kabupaten Buleleng. Bali : Universitas Udayana.
  • [15] PERMEN ESDM No. 4 th. 2020 Pasal 7 ayat 4 butir a. nomor 1.
  • Tentang Perubahan Kedua atas Peraturan Menteri Energi dan Sumber
  • Daya Mineral Nomor 50 tahun 2017 tentang Pemanfaatan Sumber
  • Energi Terbarukan Untuk Penyediaan Tenaga Listrik.
  • [16] Suatan, Richard. 2020. Kajian Ekonomi Perencanaan Pembangkit
  • Listrik Tenaga Mikrohidro (PLTMH) di Banjar Dinas Mekar Sari Desa
  • Panji Kecamatan Sukasada Kabupaten Buleleng. Bali: Universitas
  • Udayana.
  • [17] IRENA. 2012. Renewable Energy Technologies: Cost Analysis
  • Series. Irena Working Paper.
  • [18] PERGUB BALI No. 6 Tahun 2009 Pasal 1 Ayat 2 butir b. Tentang
  • Harga Dasar Air Pengenaan Pajak Pengambilan dan Pemanfaatan Air
  • Bawah Tanah Dan Air Permukaan. Bali : PemProv. Bali.
  • [19] PERMEN ESDM No. 12 th. 2017. Tentang Pemanfaatan Sumber
  • Energi Terbarukan Untuk Penyediaan Tenaga Listrik.
  • [20] Moonti, Usman. 2016. Bahan Ajar Mata Kuliah Dasar - Dasar
  • Koperasi.
  • [21] PERGUB BALI No. 45 th. 2019. Tentang Bali Energi Bersih. Bali :
  • Pemerintahan Provinsi Bali.

PDF:

https://jurnal.harianregional.com/jte/full-66996

Published

2020-12-31

How To Cite

SUATAN, Richard Antony; GIRIANTARI, Ida Ayu Dwi; SUKERAYASA, I Wayan. Kajian Ekonomi Rencana PLTMH di Desa Panji.Majalah Ilmiah Teknologi Elektro, [S.l.], v. 19, n. 2, p. 263-270, dec. 2020. ISSN 2503-2372. Available at: https://jurnal.harianregional.com/jte/id-66996. Date accessed: 02 Jun. 2025. doi:https://doi.org/10.24843/MITE.2020.v19i02.P20.

Citation Format

ABNT, APA, BibTeX, CBE, EndNote - EndNote format (Macintosh & Windows), MLA, ProCite - RIS format (Macintosh & Windows), RefWorks, Reference Manager - RIS format (Windows only), Turabian

Issue

Vol 19 No 2 (2020): (Juli - Desember) Majalah Ilmiah Teknologi Elektro

Section

Articles

Creative Commons License This work is licensed under a Creative Commons Attribution 4.0 International License