Abstract:

“In project construction world, many models of project planning havebeen intensively used, such as a Precedence Diagram Method (PDM). Schedulingon PDM considers dependency between activity and duration of each activity. Todeal with the limited resources, hence allocation and resources levelling need to beimplemented using Resource Scheduling Method. Activity scheduling priority isbased on activities with the minimum floating time. If some activities have thesame floating time, a problem arises in determining the priority of schedulingactivity. In the Ranked Position Weight Method (RPWM), allocation and resourceslevelling are based on positional weight of each activity. Positional weight isdetermined by adding the sum of duration of an activity with the sum of a totalduration of all following activities. The value of positional weight of an activityshows a degree of its importance in relation to other activities. The effects of theconstruction work condition on the project activity should be considered whenpreparing precedence logic (relationship of interdependency activities).”

Keywords

Keyword Not Available

Downloads:

Download data is not yet available.

References

References Not Available

PDF:

https://jurnal.harianregional.com/jits/full-3616

Published

2021-11-09

How To Cite

OKA SUPUTRA, I Gusti Ngurah. PENJADWALAN PROYEK DENGAN PRECEDENCE DIAGRAM METHOD (PDM) DAN RANKED POSITION WEIGHT METHOD (RPWM).Jurnal Ilmiah Teknik Sipil, [S.l.], nov. 2012. ISSN 2541-5484. Available at: https://jurnal.harianregional.com/jits/id-3616. Date accessed: 28 Aug. 2025.

Citation Format

ABNT, APA, BibTeX, CBE, EndNote - EndNote format (Macintosh & Windows), MLA, ProCite - RIS format (Macintosh & Windows), RefWorks, Reference Manager - RIS format (Windows only), Turabian

Issue

Vol. 15, No. 1 Januari 2011

Section

Articles

Creative Commons License This work is licensed under a Creative Commons Attribution 4.0 International License