“Construction project is a process that manages several resources so it canachieve an aim. Planning and scheduling at construction project are related to time,cost and quality required since the balance of those three aspects is the main goalthat will be pursued. There are some scheduling methods which are usually used inconstruction project completion. A Repetitive Scheduling Method is a kind ofscheduling methods that is used for a project which has repetitive activities. Thismethod enables showing resources management that contains of human resources,tools and materials without separating among those aspects. Applying RSM atBeranda Mumbul housing can shorten completion day from 31 weeks to 27 weeksand decrease the cost from Rp. 26.575.454,- to Rp. 25.424.127,- in a unit.”

Keywords

Keyword Not Available

Downloads:

Download data is not yet available.

References

References Not Available

PDF:

https://jurnal.harianregional.com/jits/full-3561

Published

2021-11-09

How To Cite

WIRANATA, Anak Agung; PARAMI DEWI, A.A Diah; NURYAWAN, I Made. PENGGUNAAN METODE PENJADWALAN BERULANG (REPETITIVE SCHEDULING METHOD) PADA PENGERJAAN PROYEK PERUMAHAN (Studi Kasus Pada Proyek Perumahan Beranda Mumbul).Jurnal Ilmiah Teknik Sipil, [S.l.], aug. 2009. ISSN 2541-5484. Available at: https://jurnal.harianregional.com/jits/id-3561. Date accessed: 02 Jun. 2025.

Citation Format

ABNT, APA, BibTeX, CBE, EndNote - EndNote format (Macintosh & Windows), MLA, ProCite - RIS format (Macintosh & Windows), RefWorks, Reference Manager - RIS format (Windows only), Turabian

Issue

Vol. 13, No. 2 Juli 2009

Section

Articles

Creative Commons License This work is licensed under a Creative Commons Attribution 4.0 International License